HRC Logo

HRC Consultants Ltd

Project experience

This section summarises Harry Cripps’ project engineering and consultancy experience. The projects listed cover a wide range of process, energy and environmental assignments based on a professional career of more than 30 years working for a wide range of process industries.

Click on the projects below for more information.

  • 2014-3 — Paper mill fresh water reduction by cooling and recycle of treated effluent
  • 2014-2 — Paper mill heat recovery project rationalisation and assessment of potential
  • 2014-1 — Composter plant cooling project
  • 2013-2 — Tank storage facility energy review
  • 2013-1 — Steam expander CHP potential assessments
  • 2012-2 — Paper mill heat recovery modelling
  • 2012-1 — Sea salt evaporation pilot plant
  • 2011-2 — Paper mill effluent temperature reduction
  • 2011-1 — Anaerobic digester plant process design review
  • 2010-1 — Manufacturing plant energy reduction surveys
  • 2009-2 — Paper mill (tissue) heat recovery
  • 2009-1 — Energy optimisation training courses/seminars
  • 2008-4 — Guide to energy saving opportunities on drying and evaporation plant
  • 2008-3 — Paper mill CHP and heat recovery project
  • 2008-2 — Precipitated calcium carbonate (PCC) plant Pinch and heat recovery projects
  • 2008-1 — Pulp mill pinch analysis and heat recovery project identification
  • 2007-3 — Pulp mill effluent gasification project — initial phase
  • 2007-2 — Mineral processing plant power saving project
  • 2007-1 — Evaporation plant optimisation projects (continuation of project 05/1)
  • 2006-3 — Paper mill heat recovery project
  • 2006-2 — Animal waste disposal plant
  • 2006-1 — Energy saving opportunity assessments on a range of manufacturing plant sites
  • 2005-1 — Evaporation plant process integration study
  • 2004-4 — Energy and water minimisation methodology review — Pulp & Paper Industry
  • 2004-3 — Walk–through water saving survey — food plant
  • 2004-2 — Preliminary process integration review — mineral processing site
  • 2004-1 — Heat and material balances animal waste disposal plant
  • 2003-3 — Preliminary energy surveys (Action Energy)
  • 2003-2 — Pulp mill process integration study
  • 2003-1 — Kraft pulp mill process integration scoping study
  • 2002-5 — Deinking mill heat and material balance
  • 2002-4 — Paper mill, energy balances and review
  • 2002-3 — Paper mill, thermal energy review
  • 2002-2 — Pulp and paper mill steam and water saving study
  • 2002-1 — Pulp and paper mill steam and water saving study
  • 2001-3 — Paper mill, thermal energy saving scoping
  • 2001-2 — Pulp mill process energy review
  • 2001-1 — Process water use/reuse optimisation, multiple–site industrial estate
  • 2000-4 — HAZOP study paper mill operations
  • 2000-3 — Energy audits, various manufacturing sites
  • 2000-2 — Water savings, scoping & contaminant balances — chemical plant
  • 2000-1 — Energy and water savings audit/scoping review — dairy processes
  • 1999-2 — Integration of effluent evaporation capacity — food process
  • 1999-1 — Energy integration scoping review — chemical plant
  • 1998-2 — Energy integration and water system optimisation — pulp & paper
  • 1998-1 — Chemical plant hot utility strategy review
  • 1997-4 — Supervision/review of pulp & paper mill process integration studies
  • 1997-3 — Pinch analysis kraft pulp & paper mill
  • 1997-2 — Pulp mill energy saving & cooling water demand minimisation study
  • 1997-1 — Combined heat and power (CHP) scoping study for new papermill
  • 1995-2 — Energy saving Pinch Technology study for pulp mill
  • 1995-1 — Process integration studies various pulp & paper mills
  • 1994-2 — Heat and material balances organic and inorganic chemical plants
  • 1994-1 — Drying technology feasibility analysis — food industry
  • 1993-2 — Process Bottleneck Study — Kraft pulp & paper mill
  • 1993-1 — Energy Scoping Study — Kraft pulp mill
  • 1992-2 — Energy Integration Study — multiple Kraft mill site
  • 1992-1 — Energy scoping study of corn processing plant
  • 1991-1 — Site environmental and waste minimisation study — chemical plant
  • 1988-2 — Energy integration Pinch studies — wide range of processes
  • 1988-1 — Black liquor evaporation optimisation
  • 1986-1 — Energy optimisation conceptual and detailed design kraft pulp mill
  • 1981-1 — Project/process engineer kraft pulp mill project
  • 1979-1 — Food industry cereal manufacture
  • 1974-1 — Tinplate mill effluent treatment and recovery
  • Harry Cripps MA MSc DMS CEng CEnv FIChemE MEI hrc at hrcconsultants dot co dot uk